After-sales Service: | Overseas Engineer |
---|---|
Automation: | Automatic |
Computerized: | Computerized |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Machine Type | SMED (Single Minute Exchange of Die) | |||||
Item | Unit | ESS1214S/Q/E | ESS1417S/Q/E | ESS1618S/Q/E | ||
Outer Diameter | mm | 5363x3310x4852 | 5363x3610x5152 | 5363x3710x5352 | ||
Mould Size | mm | 1200x1400 | 1400x1700 | 1600x1800 | ||
Max.Product Height | mm | 350 | 350 | 350 | ||
Mould-Open Distance | mm | 1200 | 1200 | 1200 | ||
Guide Pillar | Outer Diameter | ¢ | 80 | 80 | 100 | |
Qty | pcs | 4 | 4 | 4 | ||
Hydraulic Cylinder | Inner Diameter | ¢ | 125 | 150 | 150 | |
Stroke | mm | 1200 | 1200 | 1200 | ||
Lock force | bar | 29437 | 42390 | 42390 | ||
Material Hopper | Volume | L | 145 | 145 | 145 | |
Qty | pcs | 2 | 2 | 2 | ||
Steam | Inlet | DN | 100 | 100 | 100 | |
Mould Inlet | DN | 65x2 | 50x4 | 50x4 | ||
Pressure | bar | 2.5 | 2.5 | 2.5 | ||
Consumption | Kg/cycle | 6 | 7.5 | 9 | ||
Cooling Water | Inlet | DN | 80 | 80 | 80 | |
Mould Inlet | DN | 50 | 50 | 50 | ||
Pressure | bar | 4 | 4 | 4 | ||
Consumption | Kg/cycle | 40 | 50-120 | 60-160 | ||
Vacuum | Connector | DN | 100 | 100 | 100 | |
Drainage | DN | 100 | 100 | 100 | ||
Compressed Air | High Pressure | Inlet | DN | 65 | 65 | 65 |
Pressure | bar | 4 | 4 | 4 | ||
Low | Inlet | DN | 50 | 50 | 50 | |
Pressure | Pressure | bar | 5 | 5 | 5 | |
Hydraulic | VolumeMotor | Kw | 7.5 | 11 | 11 | |
L | 400 | 400 | 400 |
Hydraulic System:
1. Q: Where is your company located? How can I visit there?
A: Our factory is located in Hangzhou City, Zhejiang Province, China. Welcome to visit us.
2. Q. Do you have some videos where we can see the line producing?
A: Yes, we can provide some videos for reference.
3. Q: What's the MOQ?
A: Our MOQ is 1 Set.
4. Q: Can I have my own customized product?
A: Yes. Your customized requirements for color, logo, design, package, carton mark, your language manual etc. are very welcome.
5. Q: Can you produce according to the samples?
A: Yes, we can produce mold by your samples or technical drawings.
6. Q: What's the delivery time?
A: Generally, it will take 20 to 60 days after receiving your advance payment. The specific delivery time depends on the items and
the quantity of your order.
7. Q: What is the payment terms?
A: T/T, L/C, D/P at sight
8. Q: How does your factory carry out quality control?
A: We attach great importance to quality control.Every part of our products has its own QC.
9. Q: What certificate do you have?
A: We have TUV, CCC, CE (EN71, EN14765), SGS, ISO9001 etc. Also we can apply any certificate if you need if the qty is OK.